Tag Archives: Water

Getting Ready for Spring 2016

Its never too early to start planning for Spring.  One of the Fall

Pat trying her had at running the trencher.
Pat trying her had at running the trencher.

projects is to rough-in the water and power for the Dock Area.  We decided that we did not need water on the dock at this time so the plan is for a Yard Hydrant.  We are

The trench for the water and electric was dug to 18-inches
The trench for the water and electric was dug to 18-inches

installing a utility outlet in the area and we are running a 220-volt line that will be stubbed off at the foot of the dock for a

285 feet of 18" x 4" trench from garage to dock.
285 feet of 18″ x 4″ trench from garage to dock.

future boat lift should the need arrive.

Water and Utility outlet now wishing 10 feet of dock.
Water and Utility outlet now wishing 10 feet of dock.
IMG_3484
220 Volt line for future boat lift.