Lots going on, Front Deck installed, Lighting Fixtures, switches, outlets, and other electric work including the generator.
Library cabinets complete awaiting doors on the bottom. Pantry started, etc.
This week the contractors began the painting. As color goes on the walls the ceilings in the Great Room and Dining area get a coat of flat black paint, this way if the recycled southern yellow pine should move you will not see the primer behind it.
Note: Pat and I moved all of the reclaimed pine over from the barn this past weekend to make room in the barn for the construction of the pantry shelves and cabinets for great room, office and laundry.
The Wolf composite decking arrived today (7/26/2017.) Hopefully we can get the pedestals completed, we were waiting on the decking, so we can get the condensers installed and we can fire up the AC to get the place climatized and then the finishing can begin. The doors and moulding arrived this week.
Hardwood floors are in transit.