Its never too early to start planning for Spring. One of the Fall

projects is to rough-in the water and power for the Dock Area. We decided that we did not need water on the dock at this time so the plan is for a Yard Hydrant. We are

installing a utility outlet in the area and we are running a 220-volt line that will be stubbed off at the foot of the dock for a

future boat lift should the need arrive.

